Turn plans into quantities
Measure the materials and work before you price or order. A takeoff can show areas, lengths, volumes, or item counts.
Upload plans for a draft or enter field dimensions. Review each quantity and unit before it reaches a quote or Budget.
Use the unit that fits the work
Match each item to the unit you buy and install. Use SF for area, LF for length, EA for items, CY for volume, LB for weight, and SQ for roofing.
Save the quantity and unit together. Keep unconfirmed measurements separate until you verify them.
Review quantities before pricing
Check the plan scale, openings, edges, and transitions. Keep the room or location with every field measurement.
Send reviewed quantities to quote lines. PM uses Schedule and supplier timing to calculate an order-by date.
Use the takeoff through the job
Keep the takeoff with plans, quotes, and Documents. Update affected quantities when the scope changes.
Note the source and each change. Everyone reviewing the work starts from the same measurements.
Willow Creek example
In a Willow Creek room, a 10-by-12-foot floor measures 120 square feet before openings or waste. The perimeter is 44 linear feet before deducting openings. Flooring and trim need different units and notes. Confirm dimensions, product coverage, and scope before pricing or ordering.
Frequently asked questions
What does a construction takeoff include?
A takeoff lists areas, lengths and item counts, with units and measurement notes. Check those quantities against the plans and site before pricing the work.
Is a takeoff the same as an estimate?
No. A takeoff gives you quantities. Add unit prices, labor, budgets, and exclusions in the quote to build the estimate.