Estimating

Construction estimating software clients can review and sign.

Build an itemized estimate, review the quantities and prices, then send a proposal your client can accept by item and sign with a typed name.

Plug and playManual estimates: Sign in and it works. Enter quantities and prices in the project Quotes tool.

Plug and play: sign in and it works. Your plan, permissions and project assignment apply.

Itemized estimate

Each line
Quantity times unit price
Grouped work
Trade and category subtotals
Next step
Review prices and send the proposal
Read the full client proposal
Willow Creek - Primary bath

How it works

Build the estimate from your own prices, plans and field measurements.

  1. Add job details. Choose a template or enter dimensions, prices, plans, photos, and measurements.

  2. Build the proposal. Use template prices and reviewed takeoff quantities in the proposal.

  3. Check and send. Check quantities, price, scope, and recipient before sharing the proposal.

  4. Keep the signed proposal handy. Keep the signed proposal, selections, estimate, and budget history with the project.

Read the step-by-step Help Center article

Start the estimate

Choose a starting point that fits the job. Review the work and quantities before you price it.

Template

Start from saved work

Choose a template, enter the job size, and review the scaled lines.

Quote from the field

Build from site measurements

Add areas, measurements, photos, and work details, then review the quantities.

Quote from a floor plan

Build from a floor plan

Upload plans and review the estimate draft before using it.

Draft from a short description

Describe the work

Describe the job and review the itemized draft before sending.

Price the work

Choose how to price each estimate, then check the finish level.

Use template prices

Keeps the saved line-item prices.

Use your cost codes

Matches saved prices where it can; review any unmatched lines.

Enter a price per square foot

Your rate and area set the total, then the lines share it.

Market rate (HHM Intelligence estimate)

Review and adjust the suggested price for each line.

Enter a price per square foot
$ rate / sf x sqft = $total

Enter your own rate and area to see the math. The estimate distributes that exact total across its itemized lines.

Finish level

EssentialSignatureLuxury

Changes cabinets, countertops, appliances, interior finishes and exterior finishes. Structure, rough-ins, labor-only systems and permits keep their pricing.

With a $/sf price, the total stays exact; finish level changes its distribution. Finish multipliers can be tuned per company.

Cost Codes

Demolition labor
HR · $68.00 · Labor
Dumpster, 10-yard, haul-off
EA · $485.00 · Service
Subfloor repair, ¾" plywood
SF · $8.50 · Material and labor
Blocking and curb framing labor
HR · $62.00 · Labor

Company units and costs feed future quotes, templates, budgets and takeoffs.

Willow Creek - Primary bath

Your costs and template size

Reuse your saved prices. Templates, estimates, budgets, and takeoffs use your cost codes.

Scale a template to the job. Enter the actual size and review the scaled lines.

Measurement approach

Keep measurements with the estimate. Review them beside the work before sending.

Show the math

See every line calculation. Each line shows its quantity, unit price, client description, and team notes.

Improve a template with HHM Intelligence. Review the completed estimate and keep your changes.

What the client sees

The proposal groups itemized lines by category. Status tells the client what needs a decision.

Construction proposal

Cedar Ridge Construction

Willow Creek Residence – Primary bath

Project Total$26,209.17Includes Contingency · $932.40

Work included

Pricing can come from company cost codes, a saved template, your $/sf rate or a reviewed market rate. This proposal uses Cedar Ridge’s cost codes.

Demolition$2,200.47
Demolition labor

Remove the existing fixtures and finishes; protect adjacent rooms.

Included
20HR$81.10$1,622.00
Dumpster, 10-yard, haul-off

Provide a 10-yard container and haul away the demolition debris.

Included
1EA$578.47$578.47
Framing$1,773.64
Subfloor repair, ¾" plywood

Replace damaged subfloor areas with plywood ready for finish work.

Included
24SF$10.14$243.36
Blocking and curb framing labor

Add fixture backing and frame the shower curb.

Included
12HR$73.95$887.40
2×4 niche and partition framing

Frame the shower niche and bath partition.

Included
14LF$45.92$642.88
Plumbing$4,401.15
Shower valve and trim, supply and install

Supply and fit the shower control valve and finish trim.

Included
1EA$930.32$930.32
Faucet set

Supply and install the two selected faucets.

Included
2EA$405.52$811.04
Toilet, set

Set the toilet and connect it to the plumbing connections.

Included
1EA$620.21$620.21
Plumber labor

Complete bath supply, drain and fixture connections.

Included
18HR$113.31$2,039.58
Electrical$2,161.21
Recessed LED light, supply and install

Supply and install four recessed LED fixtures.

Included
4EA$152.67$610.68
Exhaust fan, supply and install

Supply and install bath ventilation.

Included
1EA$369.74$369.74
GFCI outlet or switch

Install the protected outlets and switches in the bath work.

Included
5EA$73.95$369.75
Electrician labor

Complete wiring and fixture connections for the bath.

Included
8HR$101.38$811.04
Waterproofing and drywall$1,694.80
Cement board, shower walls

Install cement-board backing at the shower walls.

Included
120SF$5.01$601.20
Waterproofing membrane

Apply the shower waterproofing system before tile installation.

Included
120SF$3.70$444.00
Drywall, hang and finish

Hang and finish the surrounding drywall surfaces.

Included
160SF$4.06$649.60
Tile$7,042.62
Floor tile, supply and install

Supply and install the selected bath floor tile.

Included
96SF$28.63$2,748.48
Shower wall tile, supply and install

Supply and install the selected shower wall tile.

Included
120SF$31.61$3,793.20
Niche and trim

Finish the niche and tile transitions with trim.

Included
2EA$250.47$500.94
Paint$764.00
Walls and ceiling

Prepare and paint the bath walls and ceiling.

Included
400SF$1.91$764.00
Glass$2,203.88
Frameless shower enclosure

Supply and fit the frameless enclosure to the finished shower.

Included
1EA$2,203.88$2,203.88

Allowances · your selections

Vanity and countertopChoose the vanity and countertop within this allowance.Pending selection$2,200.00
Mirror and accessoriesChoose the mirror and bath accessories within this allowance.Pending selection$450.00

Allowances adjust to the actual selections through an agreed change order.

Proposal summary

Included work
$22,241.77
Allowances
$2,650.00
Permit and plan fee
$385.00
Contingency
$932.40
Project Total$26,209.17

Deposits & Progress Payments

  1. 1
    Deposit

    Due at signing

    10% of Project Total
    $2,620.92
  2. 2
    Rough-in complete

    Plumbing and electrical rough-in inspections passed

    30% of Project Total
    $7,862.75
  3. 3
    Tile complete

    Tile installed and finish work reviewed

    30% of Project Total
    $7,862.75
  4. 4
    Final walkthrough

    Final walkthrough and agreed punch items complete

    30% of Project Total
    $7,862.75

Total payments$26,209.17

Contingency

$932.40 is reserved for concealed conditions and necessary work adjustments. Cedar Ridge manages the reserve with client approval for its use; the unused portion is credited at closeout.

Terms & Conditions

  • The accepted items and selections define the agreed work.
  • Payments follow the milestones and completion triggers above.
  • Work, price and schedule changes are documented in a change order for client signature.

Client signature

Accept or decline by item or category, then sign with your typed full name.

Proposal line statuses
Included
Agreed work
Optional
Client decides
Client Responsibility
Work assigned to the client
Other
Fee, permit or contingency
Pending
Awaiting client review

The Willow Creek primary-bath proposal shows Includes Contingency, Valid Until and Finish Level.

Deposits & Progress Payments

Set payment milestones. Use a percentage or dollar amount and explain when each payment is due.

Terms & Conditions

Review the terms with the proposal. Send only when the work and terms are ready.

Contingency

Explain the contingency. State its purpose, control, and what happens to unused money.

Keep costs private. Clients see agreed line prices while your team sees the cost breakdown.

Client signature

Collect the client’s decision. They choose items and sign with their full name.

From acceptance to the job budget

Start the job budget. An accepted estimate carries agreed work into budget lines and the first invoice.

Explore budgets and invoices

One click to the takeoff and order dates

Create a takeoff from a description or floor plan, then review and edit its quantities. The takeoff creates or updates an estimate and adds items to the budget.

Takeoffs

Floor tile
96 SF
Shower wall tile
120 SF
Drywall
160 SF
Status
Review quantities before use

Use reviewed quantities in Quotes, Budget and ordering.

Willow Creek - Primary bath
  • Upload sheets.
  • HHM reads a draft (Growth+).
  • Review, then convert to a quote.
See plan takeoffs
TakeoffYou review
QuoteYou approve
BudgetYour team budgets

Work grouped by task

  1. Planning and site
  2. Foundation
  3. Structure and dry-in
  4. Rough-ins
  5. Insulation and drywall
  6. Interior finishes
  7. Exterior finishes
  8. Final and closeout

Each task includes order-timing guidance per trade.

Create or update an estimate from this Takeoff

Move takeoff lines into an estimate. Choose an existing estimate or create a new draft.

Review before sending. Check the work, quantities, and prices.

Add to budget

Add takeoff items to the budget. Signed additions can be proposed as change orders.

When to order materials

Link each material to the scheduled task that needs it. The order date follows that task's start date, less supplier lead time and your buffer in calendar days.

Task start − supplier lead time − buffer = order date

If the linked scheduled task changes, the dates move. Your plan sets the order-by dates; you send the orders when you are ready.

See schedule-led ordering

Keep supplier prices with the estimate.

Upload a supplier price file, link material items to your cost codes once, and new estimates use the latest saved material cost. Each quote line shows its price source and update date, while sent and existing quotes keep the price saved with that quote.

Bring in your price file

Match the columns, review the price rows and save a file from your supplier. Re-upload the same item numbers when prices change to keep a dated price history.

Price the right unit

Link a supplier item to the matching cost code. Enter the supplier units needed for one cost-code unit when coverage differs, then review labor and markup before you send the estimate.

Review material changes

Choose the percentage that needs attention. PM records an alert when a supplier cost moves past that amount, so your team can review the change before the next quote.

See supplier pricing and cost codes

When the work changes.

Signed baseline

$26,209.17

Willow Creek bath remodel

Add heated floor

Heated floor mat: 96 SF × $14.00 = $1,344.00

Electrician: 3 HR × $85.00 = $255.00

Change: +$1,599.00 before overhead and profit

The change order records the agreed installation sequence and schedule effect.

Signed prices stay fixed; clients sign changes before the budget updates.

Get a draft to review

Plan reading

Growth+

Read sheets into a takeoff draft.

Field-quote line suggestions

Growth+

Suggest lines for your review.

Council: check the estimate

Pro+

Review gaps and inconsistencies before approval.

Estimating questions.

Can I price by the square foot?

Yes. Enter a price per square foot multiplies your rate by square footage and scales itemized lines to that exact total.

Do takeoffs buy materials?

Your plan sets order-by dates from the linked schedule step, supplier lead time and buffer. You approve and place every order when you are ready.

Can clients decline one item?

Yes, an item or whole category.

Do I have to use templates?

Choose a template, field measurements and photos, a floor plan or a short description. Start blank is also available in Create estimate.

Is the signature legally binding?

Typed-name signatures are recorded with the proposal; check contract requirements with your attorney.

Keep the job moving

Previous stepPhone, text, email and pushNext stepVisualization and selectionsEvery toolBrowse all tools